Everyman Theatre

From the outset the New Everyman Theatre had very defined requirements from the client in terms of the internal environment and the energy usage. The building had to be low energy and incorporate sustainable technology to lower the energy consumption of the theatre, as well as achieve a BREEAM EXCELLENT rating.

everyman_internal_stairs

Project Details
  • Architect

    Haworth Tompkins Architects

To this end we worked very hard to design an auditorium that could operate naturally, using the warm air buoyancy of the audience as the main driving force for air movement.  We have designed a low level inlet plenum that sits below the theatre and four 2.5m wide by 5m high stack chimneys at roof level to help drive the air movement through the auditorium. Combine this energy efficient approach with a combined heat and power (CHP) plant to generate electrical power; we have managed to provide B rated EPC building, which is 20% below the current building regulations energy requirements.

A post occupancy seasonal commissioning exercise was carried out following completion of the building in Winter and Summer 2014 to help fine tune the way in which the building performance and attenuates the internal environment.

Other features include predominantly naturally ventilated front and back of house areas, with advanced automatic controls to serve the lighting installations and reduce internal heat gains and energy usage, which has meant a building is without cooling (except for bar cellars and IT server room).

Awards:
RIBA Best Building of the Year NW
RIBA National NW Award
RIBA Stirling Prize 2014 Best New Building of the Year
Civic Trust Awards 2015

Related Projects

  • Glasgow Commonwealth Games

    Waterman was the consulting engineers appointed to deliver the £18m temporary conversion of Hampden Park Stadium from a traditional football arena to an arena with a floor area large enough to host international athletics for use during the 2014 Commonwealth Games.

  • University of Sydney Oval 2 Grandstand

    Waterman has been appointed as building services, structural and civil engineering consultant for the new University of Sydney Oval 2 Grandstand.

  • Arsenal Football Club

    As part of Arsenal Football Club’s plans to build a new 60,000 seat stadium at Ashburton Grove, Waterman was appointed to provide visual, ecology, archaeology and cultural heritage impact assessments.

  • Scottish Ballet Headquarters

    The purpose of this part-refurbishment, part-new build has been specifically targeted to meet the current and future needs of the Scottish Ballet company, based in Glasgow.

  • Trocadero

    Waterman provided engineering and planning supervisory services for refurbishment at Trocadero, involving alterations to the existing operational leisure complex in Piccadilly.

You Might Also Like…

  • New Environmental Apprenticeship Scheme out for consultation 18 September 2018

    Following a long period of development by the Trailblazer committee, co-chaired by Waterman’s Anna Bacon, the draft Level 6 (degree) Apprenticeship Standard for Environmental Practitioners is now out for public consultation.

  • Second IFC Jersey building completes 13 September 2018

    We are pleased to celebrate the completion of IFC 5 at IFC Jersey, St Helier. This six-storey 69,000 ft2 Grade A office building is the second to be completed at the International Finance Centre in Jersey following IFC 1 being handed over in March 2017.

  • Emergency Repairs at Dublin’s Dun Laoghaire Harbour 12 September 2018

    Fuelled by the heavy snowstorms and continued severe weather of the first half of 2018, very heavy seas and elevated sea levels resulted in coastal flooding and damage to coastal structures and harbours along the east coast of Ireland in March.

  • Dublin’s Harcourt Terrace National School gets the go-ahead 4 September 2018

    Harcourt Terrace National School in central Dublin has secured planning permission from An Bord Pleanala, the Irish planning appeals board, and is set to proceed towards construction in 2019.