BAE Govan – Wet Dock Hall

Published 1st April 2025

Measuring 170m long and 80m wide, BAE’s vast new Glasgow Wet Dock Hall facility on the banks of the River Clyde will be large enough for two Type 26 frigates to be constructed simultaneously, with extensive provision of both gantry cranes and runway cranes.

Our team delivered structural engineering services for this project.

LinkedIn
Waterman